06 November 2014
The final assembly of Airbus’ first A330 with the new 242 tonne maximum take-off-weight (MTOW) capability is underway at the A330 Final Assembly Line in Toulouse, France. The aircraft is currently completing its structural assembly before the cabin integration phase and will be used for certification flight trials. A second aircraft is being assembled in parallel which is destined for entry in service in Q2 2015 with launch customer for the new weight variant, Delta Air Lines.

Patrick Piedrafita, Airbus’ Head of the A330 Programme said: “I am very proud to see the first 242 tonne A330 at the final assembly stage only two years after launch. This newest, enhanced variant of our popular A330 Family is the basis for the future A330neo and is a concrete example of Airbus’ incremental innovation strategy in action.” He added: “Airlines operating the new 242 tonne A330 will be able to carry additional payload on longer routes, while at the same time enjoying a very high operational reliability of 99.4 percent.”

See the full article at Airbus